三台阶七步法下穿既有铁路的沉降控制技术研究

Research on Settlement Control Technology of Tunnels Beneath Existing Railroad With Three-bench Seven-step Method
下载PDF
导出
摘要 山岭隧道施工必然会对地面既有铁路线造成一定影响,为了控制风险需选择合理的施工方法减小围岩变形,通过有限元软件模拟,对比不同工法的位移场从而选择最合理的工法,并结合现场实践总结出采用三台阶七步法施工沉降控制技术的要点。 Construction of moutain tunnels must have some impact on the overhead existing railway,and in order to control the risk we need to choose a reasonable construction method to reduce the deformation of surrounding rock.By finite element software simulation,we selected the most reasonable construction method by comparing the displacement field of different construction methods,and summed up the settlement control points of Three-bench Seven-step Method according tome construction in practice.
出处 《工程建设与设计》 2015年第3期95-97,共3页 Construction & Design for Engineering
关键词 山岭隧道 施工方法 三台阶七步法 沉降控制 moutain tunnels construction method three-bench seven-step method settlement control
  • 相关文献

参考文献3

二级参考文献32

共引文献118

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部