桩偏位后两桩承台内力协同分析与配筋设计

Synergy analysis of the cap with two piles which piles deviation overrun and the reinforcement design
下载PDF
导出
摘要 两桩承台桩位偏差超限时,基于桩与承台共同工作的特性,提出了桩、承台与地基受力协同分析的方法,并对一工程实例提出了处理方案。对于承台,一般应进行扭矩-地基反力协同分析,并通过配筋设计满足承载力要求。当通过协同分析能够满足承载力要求时,可不必对偏位桩进行过度处理,以节省施工费用,加快施工进度。 Two piles cap which piles deviation overrun,based on the characteristics of the cap work together with the piles,raised an analysis method which collaborative the piles,cap and the foundation,and the treatment scheme is proposed with a project. For the piles cap,in general should be synergy analysis the torque-ground reaction force,and through the reinforcement design to meet the capacity requirements. When the synergy analysis can meet the requirements,should not be excessive treatment on the deviation piles,in order to save the cost,speed up the construction progress.
作者 张宪江
出处 《四川建筑科学研究》 2014年第6期121-123,共3页 Sichuan Building Science
关键词 桩位偏差 协同分析 配筋设计 pile deviation synergy analysis reinforcement design
  • 相关文献

参考文献6

  • 1土木工程网www. civilcn. com/jiegou/jglw/lilun/1304566675142520. html,2011-5-5.
  • 2谭文杰,杨光华,钟显奇,谭玉梅.高层建筑预应力管桩偏移的检测及处理[J].广东土木与建筑,2003,10(10):56-59. 被引量:4
  • 3GB50202—2002.建筑地基基础工程施工质量验收规范[S].[S].,..
  • 4JGJ 94-2008,建筑桩基技术规范[S].
  • 5GB 5009-2012,建筑结构荷载规范[S].
  • 6混凝土结构设计规范GB50010—2010[S],北京,2010.

二级参考文献9

  • 1卢世深 林亚超.桩基础的计算和分析[M].北京:中国建筑工业出版社,1995..
  • 2.GB50007-2002.建筑地基基础设计规范[S].,..
  • 3.DBJ/T 15—22-98.预应力混凝土管桩基础技术规程[S].,..
  • 4.JGJ 120—99.建筑基坑支护技术规程[S].,..
  • 5.JGJ 3—2002、J186—2002.高层建筑混凝土结构技术规程[S].,..
  • 6.GB 5001 1-2001.建筑抗震设计规范[S].,..
  • 7.JGJ 94-94.建筑桩基技术规范[S].,..
  • 8陈忠友 钱丽萍编著.地基基础设计与施工丛书—深基坑工程[M].,1998..
  • 9杨孝先 张剑峰 贾国平.软土地基防止桩顶偏位的措施[M].,..

共引文献1196

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部