摘要
解决国产首架大型客机研制工程项目风险管理诸多国际性难题,提出三维风险管理、熵风险评价原理和方法,攻克大型客机研制项目组织、进度五个领域全寿命期风险管理的系列关键问题,创建了与全球配置接轨的、大型工程跨国研制的风险管理模式,以及群集成管理全量表操作实施体系(英APM-BOK V4.0),建立一体化信息风险管理平台以实现全寿命期风险管理协同效应优化,确保低风险、优质高效地实现建设目标。
Three-dimensional risk management method and entropy-risk assessment are put forward,and many difficult international problems on the development project on the first large passenger plane are solved. The key problems of life-cycle risk management on organization,schedule and so on are solved. Risk management model of large-scale project on transnational development which integration into the global allocation is created,and operational system of integrated management of cluster(APM-BOK V4.0)is established. The project with low risk,high quality and efficiency is accomplished,building a management platform of information risk integration.
出处
《中国工程科学》
北大核心
2014年第10期31-38,共8页
Strategic Study of CAE
关键词
大型工程项目管理
风险管理
熵-优化
项目群管理
large-scale projects management
risk management
entropy-optimization
project cluster management