摘要 为了探讨新建隧道的施工对既有隧道产生的影响,以西安地铁某区间盾构隧道为背景,采用三维有限元数值计算方法,分析了新建盾构隧道正交下穿施工对地表及既有隧道结构的影响,得到了既有隧道管片位移、内力以及既有隧道上方地表沉降的变化规律。计算分析结果表明:正交下穿盾构隧道施工时,上方既有隧道与地表将会发生较大的不均匀沉降,同时既有隧道衬砌结构发生不均匀侧移和扭转,正交位置附近既有隧道结构下侧出现不同程度的拉应力,需要对正交区域内的地层进行加固。 A running tunnel of Xi ' an Metro crosses perpendicularly underneath an existing tunnel. In this paper, the influence of the construction of the running tunnel on the ground surface and the existing tunnel is analyzed by means of 3 D FE numerical calculation method, and the rules of the variation of the displacement and internal force of the segment of the existing tunnel, as well as the settlement of the ground surface above the existing tunnel are obtained. The calculation and analysis results show that differential settlement will occur to the existing tunnel and the ground surface above the running tunnel, differential lateral displacement and turning will occur to the lining structure of the existing tunnel, and tension stress will occur to the crossing section of the two tunnels, where ground reinforcement should be made.
作者 康佐 代光辉
出处 《隧道建设》 2014年第10期931-936,共6页 Tunnel Construction
关键词 盾构隧道 正交下穿 管片位移 管片内力 地表沉降 shield-bored tunnel perpendicular undercrossing segment displacement internal force of segment ground surface settlement
  • 相关文献

参考文献12

二级参考文献82

共引文献605

同被引文献178

引证文献22

二级引证文献151

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部