摘要
依托港珠澳大桥埋置式承台足尺模型工艺试验项目,采用理论计算分析与试验监测相结合的办法对墩身竖向预应力损失展开研究,提出减小墩身竖向预应力损失的措施,为港珠澳大桥主体工程建设关键施工参数的确定提供依据。
Relying on the full-scale model test of embedded pile capping for the Hongkong-Zhuhai-Macao Bridge, we used the method combining theoretical calculation analysis with the tests to study the vertical prestressing loss of the pier. The measure to reduce the vertical prestressing loss is put forward to provide a basic for key construction parameters of the main works of the Hongkong-Zhuhai-Macao Bridge.
出处
《中国港湾建设》
2014年第10期44-46,共3页
China Harbour Engineering
基金
国家科技支撑计划资助项目(2011BAG07B03)
关键词
港珠澳大桥
预制墩身
竖向预应力
应力损失
Hongkong-Zhuhai-Macao Bridge
prefabricated pier
vertical prestressing
prestressing loss