摘要
针对冬夏气温变化较大的北方一年内的污染水去除率变化较大,为保证污染水一年内有较高且相对均衡的去除率,对沉淀池采取一池两用,结合复合垂直流人工湿地,对污染水进行处理,从理论上提出了本工艺的流程。
This article mainly aims at the North who se temperature changes bigger between winter and summer, the removal rate changes heavy large in one year. In order to guarantee high and relatively balanced removal rate of polluted water in one year, the sedimentation pond takes a pool of dual purpose. Combining integrated vertical flow constructed wetland to deal with the polluted water, proposing the procedure of a craft theoretically.
出处
《水科学与工程技术》
2014年第5期20-23,共4页
Water Sciences and Engineering Technology
关键词
复合垂直流人工湿地
污染水
沉淀池
Integrated Vertical Flow Constructed wetland(IVCW)
sewage
the sedimentation pond