摘要
结合南水北调中线倒虹吸工程预应力施工情况,阐述了预应力钢筋张拉及孔道灌浆中的问题及应对措施,为以后类似工程提供参考。
Combined with the prestressed construction of inverted siphon engineering of South to North Water Diversion Project, this paper explained the problems and treatment measures of the prestressed steel bar tension and grouting, and it provides a reference for the similar engineering in the future.
出处
《水科学与工程技术》
2014年第5期76-78,共3页
Water Sciences and Engineering Technology
关键词
预应力工程
张拉
灌浆
问题及处理
prestressed engineering
tension
grouting
problems and treatment