摘要
以大连中远船务工程有限公司已建造完工的12万t举力浮船坞,以及世界最大的13万t举力浮船坞为依托,从精度控制及轨道安装方面阐述了超大型浮船坞起重机轨道安装工程的工艺技术.
Based on the floating dock of 120 000 t of lifting capacity built by COSCO Dalian Ship Yard and the floating dock of 130 000 t of lifting capacity which is the largest in the world, the installation plan and technology of crane rail for the ultra- large floating clock is elaborated.
出处
《船海工程》
2014年第A01期82-86,共5页
Ship & Ocean Engineering
关键词
浮船坞
起重机轨道
精度控制
柔性固定系统
floating dock
crane rail
accuracy control
flexible fixing system