摘要
结合南通中远船务工程有限公司1 200 t重吊起重铺管船的设计与建造实例,分析海工设备底座与分段设计的协同性问题,提出可行性设计方案,实践证明该方案可对提高船体结构分段的建造效率.
In light of the design and construction practices of the 1 200 t heavy-crane pipe-laying vessel built by Nantong COSC0 Shipyard, the consistency of large offshore equipment foundation with hull block design is analyzed. The feasible plan is proposed. It is proved that the plan can increase the shipbuilding efficiency of the block.
出处
《船海工程》
2014年第A01期144-148,共5页
Ship & Ocean Engineering
关键词
海工产品
大型设备底座
结构分段设计
offshore products
foundation of large equipments
hull block design