期刊文献+

水利工程EPC工程总承包质量控制及模型分析 被引量:2

The EPC project of Water Conservancy Quality Control and Model Analysis
下载PDF
导出
摘要 对以EPC工程总承包模式建设的水利水电工程项目从EPC项目管理的方法模式、组织机构等管理理念作了简要概述。深入分析了以EPC工程总承包模式建设的水利水电全过程管理的项目质量控制、质量控制要素及各要素的控制方法。为了抓住质量控制重点,采用层次分析法((AHP)对各质量影响因素的作用进行评价与测度,建立质量控制分析模型,为有效进行质量控制提供理论依据,最后对项目质量的过程控制作了较系统的阐述。 Based on the method of EPC project management mode and organization management of EPC project general contracting mode construction made a brief overview of water resources and hydropower projects. In EPC project general contracting mode were analyzed deeply the construction of the whole process of management in water conservancy and hydropower project quality control,quality control,factors and con: trol methods for each factor. In order to seize the quality control key,this paper uses the analytic hierarchy process (ahp) to evaluate the effect of various factors affecting the quality and measure and establish the quality control analysis model. Then, provide theoretical basis for effective quality control. Finally, the process of project quality control made systematically in this paper.
作者 石永
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2014年第B02期169-173,共5页 South-to-North Water Transfers and Water Science & Technology
关键词 EPC工程总承包 质量控制 要素 结构模型分析 控制方法 层次分析法 EPC质量控制过程 EPC project general contracting quality control elements analysis of structure model control method Analytic Hierarchy Process(AHP) the EPC process quality control
  • 相关文献

参考文献7

  • 1张卫国,李金梅,王怀刚.浅析我国企业项目管理的机构设置[J].商场现代化,2006(07Z):70-70. 被引量:3
  • 2EvansGN, Pavitt T C. Organizing for improved interfaces. In- novattion in civil and eonstrueting engineering [M]. Edin- burgh.. Civil-Comp Press, 1997.
  • 3T C Pavitt, A D F Gibb. Interface management within construe- tion :in particular,building facade[J]. Journal of Construetion Engineering and Management, 2003.
  • 4冯利.工程项目管理中的质量控制五要素[J].科技情报开发与经济,2006,16(6):290-291. 被引量:12
  • 5Sanvido V E, Medeir s D J. Applying computer-integrated manufacturing concept to construction [J]. Journal of Con- struction Engineering and Management, A SCE, 1990.
  • 6John B. Miller. Engineering Systems Integration for Civil Infra- structure Projects[J]. Journal Engineering, 1997, 13(5).
  • 7陈向东.建筑工程质量前期评估与预测系统的研究[D].北京:北京工业大学,2000.

二级参考文献3

共引文献13

同被引文献27

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部