摘要
目前国家电网公司安全监督管理、政工管理、科技管理、纪检监察、班组管理、企协管理、国际合作、审计综合管理等综合管理类系统由两级部署到一级部署的改造工作已经完成。文章介绍了综合管理类系统一级部署总体技术架构,重点分析了两级部署到一级部署改造的集成方案,包括目录集成、待办集成、应用集成及数据迁移方案,通过对综合管理类系统一级部署改造集成方案总结,希望能对其他类型业务应用开展一级部署工作提供指导和借鉴。
The transformation works from two-level to one-level deployment of management information system such as safety supervision and management, administrative management, technology management, discipline inspection and supervision, team management, enterprises management, international cooperation, comprehensive audit management in State Grid corporation of China has been fi nished. The technical architecture of the integrated management system deployment is fi rstly introduced in this paper. Then, the transformation solution of two-level deployment to one-level deployment is mainly analyzed, which includes directory integration, pending business integration, application integration and data migration. Finally, the experiences of integrated solutions for system deployment are summed up to provide guidance and reference for one-level deployments of other businesses.
出处
《电力信息与通信技术》
2014年第7期69-73,共5页
Electric Power Information and Communication Technology
关键词
一级部署
待办集成
目录集成
应用集成
数据移植
one-level deployment
pending business integration
directory integration
application integration
data migration