超高层组合结构施工过程竖向变形与危险工况分析 被引量:2

The Vertical Deformation and Severe Work Condition Analysis of High-rise Building Composite Structure Construction Process
下载PDF
导出
摘要 考虑组合结构体系超高层建筑在施工期间的竖向压缩变形,通过Midas/gen软件建立有限元模型,进行施工期间危险工况验算分析,计算中考虑了筒体先于外框柱施工、混凝土材料的收缩徐变、施工过程中结构找平、风荷载、地震荷载等因素的影响。通过验算施工过程中结构竖向位移,得出竖向位移最大点位置,能够反馈给设计单位以便于进行进一步深化设计;通过建立危险施工工况有限元模型,得出结构层间位移变化,从而考虑设计加强措施。 By Midas/gen software to build high rise building composite structure construction process models, the vertical deformation and severe work condition analysis were done, which considered core tube construction prior to outer frame column, shrinkage creep of concrete, structural leveling during construction, wind loads and earthquake loads. Through checking the vertical deformation, the biggest vertical deformation can guide designer. Furthermore, severe condition simulation can get interlayer displacement angle to consider strengthening methods.
出处 《施工技术》 CAS 北大核心 2015年第2期33-37,64,共6页 Construction Technology
基金 中建三局2014年度科技研发课题计划(CSCEC3B-2014-18)
关键词 组合结构 竖向变形 危险工况 数值模拟 分析 composite structure vertical deformation severe condition simulation analysis
  • 相关文献

参考文献3

  • 1范峰,王化杰,支旭东,黄刚,祝恩淳,王宏,沈世钊.上海环球金融中心施工竖向变形分析[J].建筑结构学报,2010,31(7):118-124. 被引量:47
  • 2中国建筑科学研究院.GB50009-2012建筑结构荷载规范[M].北京:中国建筑工业出版社,2012.
  • 3中国建筑科学研究院.GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.

二级参考文献10

共引文献190

同被引文献16

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部