摘要
通过对水电建设项目环境影响评价公众参与实际工作中存在的问题进行总结分析,针对各相关利益者提出相应的要求及改善措施,以进一步提高在实际工作中公众参与的有效性。
Through analysis and conclusion of the public participation and tips in engineering practice in environmental impact assessment of hydropower projects,corresponding requirements and improving measures for relevant stakeholders are provided to further improve effectivity of the public participation in practice.
出处
《西北水电》
2015年第1期9-11,共3页
Northwest Hydropower
关键词
水电建设项目
公众参与
环境影响
评价
hydropower project
public participation
environmental impact
assessment