3Peng J L, Pan A D, Rosowsky D V, et al. High clearance scaffold systems during construction-Ⅰ. Structural modelling and modes of failure [J]. Engineering Structures, 1996, 18 (3): 247-257.
4Peng J L, Pan A D, Rosowsky D V, et al. High clearance scaffold systems during construction-Ⅱ, structural analysis and development of design guidelines [J]. Engineering Structures, 1996, 18(3): 258-267.