摘要
唐山北站改扩建工程于2014年3月21日完成了第一阶段的改造。在唐山北I期信号倒换施工过程中,对有关技术细节优化进行了有益探索,例举唐山北站换装时的几点细节优化方案,与大家共同探讨如何降低施工难度和安全风险。
The first phase of the expansion project of Tangshan North station was completed in March 21, 2014. We explore technical optimization during the process of the signal reconstruction and describe several specific optimization scheme of the reconstruction in the hope of discussing how to reduce the difficulty and safety risk of construction.
出处
《铁道通信信号》
2015年第1期24-26,共3页
Railway Signalling & Communication