摘要
呼和浩特汽车客运东站钢结构为大跨度空间双曲拱结构,采取"分阶段累积滑移"的施工方法进行安装,详细介绍了该工程的屋盖钢结构具体安装方案以及关键技术。工程实践表明,本方案安全可靠,确保了施工质量和工期节点要求。
Hyperbolic arch structure with large-span space is used in Hohhot East Passenger Station engineering, multistage accumulative sliding method is used, the specific installation scheme and key techniques are introduced in the roof steel structure engineering. Engineering practice shows that the construction scheme is safe and reliable ,which ensures construction quality and time requirement.