摘要
建筑工程的建设离不开设计变更和工程签证工作。因此,加强设计变更和签证工作的管理是施工企业谋求最大发展的重要途径。通过详细阐述设计变更和签证的涵义和内容,提出了相应的管理策略,以期为设计变更和签证管理工作的发展提供参考和依据。
The construction project construction is inseparable from the design change and engineering work visa. Therefore, strengthening the design changes and visa work management is an important way to maximize the development of construction enterprises. The meaning and content of elaborate design changes and visa, put forward the corresponding management strategy, provides the reference and the basis for the development of work for design changes and visa management in order to.
出处
《科技与创新》
2015年第4期66-66,68,共2页
Science and Technology & Innovation
关键词
设计变更
工程签证
工程管理
工程设计图
design change
engineering visa
engineering management
engineering design