摘要
"滇中红层"隧道施工存在风化剥落、顺层滑塌、塌方、冒顶等风险,结合广大铁路的隧道施工,介绍了各类事故的处理措施,为类似工程提供借鉴。
The "Yunnan red layer" tunnel construction existence weathering, bedding slide, collapse, roof fall risk, with the majority of railway tunnel construction, introduces the treatment measures of various kinds of accidents, provide the reference for the similar engineering.
出处
《科技与创新》
2015年第4期153-154,共2页
Science and Technology & Innovation
关键词
隧道施工
塌方
风化剥落
处理措施
tunnel construction
collapse
weathering flake
treatment measures