《环境影响评价技术导则输变电工程》(HJ 24—2014)自2015年1月1日起正式实施。介绍了导则修订的必要性和意义;从评价依据和程序要求、电磁环境评价工作等级和范围、评价标准和技术、公众参与等方面对导则主要内容作了解读;分析了新、旧导则的区别;并就开展输变电工程环境影响评价需注意的方面提出了建议。
The revised Technical Guidelines for Environmental Impact Assessment of Electric Power Transmission Project (HJ 24-2014 )becomes effective from January 1,2015. An interpretation of the technical guidelines is made in this article from the perspective of revisionnecessity and significance, assessment regulations, new assessment procedures, assessment level and scope, assessment standards andtechniques, and public participation, etc. The differences between the new guidelines and the previous guidelines are pointed out.Suggestions are also raised on necessary attentions in future EIA of electric power transmission projects.