期刊文献+

地铁施工期主要环境问题及管理控制 被引量:4

Major Environmental Problems and Pollution Control for Subway Construction
下载PDF
导出
摘要 目前,我国地铁建设发展快速,施工期环境影响日益突出,应给予足够重视。一般说来,地铁施工期主要存在振动与噪声影响突出、水文地质环境问题严峻、地下水防护措施不足、施工降水回用率不高、水资源浪费严重等环境问题,建议通过严格控制地铁施工时间、优化隧道掘进施工工艺、推进新技术研究及应用、加强施工降水回用、强化环境监理等手段,减缓其环境影响。 At present, with the rapid development of China' s subway construction, the environmental impact during its construction periodis increasingly prominent, which should be paid enough attention to. In general, those environmental problems include prominent vibrationand noise, severe hydrogeological environment problems, lack of groundwater protection, low recycling rate of construction precipitation,severe waste of water resource etc.. In order to mitigate the environmental impact of the subway construction, the paper raised the followingsuggestions: the subway construction time should be strictly controlled; the tunneling excavation blasting technology should be optimized;research and application of new technologies should be promoted; reuse of construction precipitation should be strengthened; andenvironmental supervision should be enhanced.
出处 《环境影响评价》 2015年第1期41-43,共3页 Environmental Impact Assessment
关键词 地铁 施工期 环境问题 控制 管理 subway construction period environmental problem control management
  • 相关文献

参考文献3

二级参考文献3

  • 1中华人民共和国建材行业标准.JC506-92无声破碎剂[S].国家建筑材料工业局,1992.
  • 2郭伟,等.SZJXGF31-2008静力爆破施工工法[S].深圳市市政工程总公司,2008.
  • 3王连成.静力破碎剂的自制与应用[J].山东煤炭科技,2011,29(1):205-206. 被引量:3

共引文献26

同被引文献28

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部