摘要
论述了PHC管桩采用蒸养-蒸压两次养护工艺的利和弊,并对当前我国采用该工艺和取消蒸压养护工艺所存在的问题进行了商讨。
The advantage and disadvantage of two times curing process of steam curing and autoclaved curing for PHC pile, and some problems from using the curing process and canceling the autoclaved curing process in China are discussed
出处
《混凝土与水泥制品》
2015年第3期32-34,共3页
China Concrete and Cement Products