承包商成本控制风险因素探讨与对策

On risk factors and countermeasures of contractor's cost control
下载PDF
导出
摘要 成本控制是项目管理的重要内容,更是承包商项目管理的基础工作。在调查的基础上,确定了影响承包商成本的主要风险因素:业主资金未及时到位、投资回收期长、业主提出的设计变更等。对这些风险因素进行了分析,指出问题的关键所在并给出相应的对策和措施。指导承包商可以根据实际情况采取积极有效的应对措施,提高自身的抗风险能力和市场竞争力,最大限度地实现项目的经济效益。 Cost control is an important content of project management. And it is a foundation work of contractor's project management. Based on investigation,this paper finds out that the risk factors influence contractor's cost control,including the owner's lack of money,investment capital retrieved in a very long time,design change by the owner,etc. And these risk factors are briefly analyzed in detail. Key problems and countermeasures are presented as well. Thus the contractors may,by considering their own situation,take positive and effective measures to improve their risk resistance capacity and market competitiveness and maximize economic benefit from the project.
作者 康香萍
出处 《河南城建学院学报》 CAS 2014年第6期47-52,共6页 Journal of Henan University of Urban Construction
基金 河南省科技厅计划项目(112400430116)
关键词 成本控制 风险因素 承包商 调查 cost control risk factors contractor survey
  • 相关文献

参考文献6

二级参考文献12

  • 1新闻[N].北京日报,2001-12-11.
  • 2P. W. Beamish. The Characteristics of Joint Ventures in the People's Republic of China [J]. Int. Marketing,1993, (2): 29-48.
  • 3B. Li, R. L. K. Tiong. Risk Management In International Construction Joint Ventures [J]. Constr. Eng. Manage., 1999, (4): 277- 284.
  • 4B. Li, R. L. K. Tiong. Risk Management Model For International Construction Joint Ventures [J]. Constr.Eng. Manage., 1999, (5): 377-384.
  • 5L. Y. Shen, George W. C. Wu. Risk Assessment For Construction Joint Ventures In China [J]. Constr. Engrg.Manage. , 2001, (1): 76-81.
  • 6WANG Shou-qing, R. L. K. Tiong. Political Risks:Analysis of Key Contract Clauses in China's BOT Project [J]. Constr. Engrg. Manage., 1999, (3): 190- 197.
  • 7WANG Shou-qing, R. L. K. Tiong. Evaluation and Management of Political Risks in China's BOT Projects [J]. Constr. Engrg. Manage., 2000, (3): 242-250.
  • 8Earl Babbie. The Practice of Social Research (8th Ed. )[M]. Wadsworth Publishing Company, 1998.
  • 9Peter F. Kaming, Gary D. Holt. Severity Diagnosis of Productivity Problems-a Reliability Analysis [J].International Journal of Project Management, 1998,(2) : 107 - 113.
  • 10J. C. Nunnally. Psychometric Theory. 2nd Edition[M]. McGraw-Hill, New York, 1978.

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部