期刊文献+

勐曼水电站进场公路缓和曲线与竖曲线的分析

Example Analysis of Transition Curve and Vertical Curve of Access Road of Mengman- 2 and Mengman- 3 Hydropower Stations
下载PDF
导出
摘要 勐曼二、三级水电站进场公路缓和曲线和竖曲线,为了有效控制工程质量、准确检核道路轴线的偏移情况、合理控制高边坡的超欠挖,精确核定土石方开挖工程总量,理论与实际相结合,确保工程可控在控。设计阶段,借助纬地道路设计软件、海地道路设计软件、鸿业市政道路设计软件等专业软件,可以在电脑上轻易获得缓和曲线、竖曲线的相关参数及有关点位坐标。文中介绍的方法,回归缓和曲线、竖曲线的基本原理,通过CASIO fx-4 800 p编程进行大量的数据处理,准确、简单、方便、快捷。 The total length of the access roads 293121km, which includes 129 sections with a to Mengman- 2 and Mengman- 3 hydropower stations is 11. transition curve (138 sections with a horizontal curve), 20m long each, 2.58km in total, accounting for 22.85% of the total road length and 61 sections with a vertical curve, the maximum longitudinal slope of 9%, the shortest slope length of 39.501m, the convex radius of 4OOm and the mini- mum concave radius of 450m. In order to control the project quality in an effective way the deviation of the road ax- is was precisely examined and checked, both overexcavation and underexcavation of high slopes were properly con- trolled, the total quantity of the earth - rock excavation was accurately checked and ratified, theory was integrated with oractice so that the construction of the road Droiect was ensured to be controllable or under control.
作者 邹仕华
出处 《云南水力发电》 2015年第1期92-97,共6页 Yunnan Water Power
关键词 公路工程 缓和曲线 圆曲线 竖曲线 road engineering transition curve circular curve vertical curve
  • 相关文献

参考文献4

二级参考文献1

  • 1[3]道路施工工程师手册[M].北京:人民交通出版社,1999,3.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...