风险链视角下建设项目进度风险评估 被引量:29

Novel Method for Schedule Risks Assessment in Construction Projects from Perspective of Risk Chain
下载PDF
导出
摘要 归纳出风险链的概念,并提出以风险链为评估对象的进度风险评估方法:利用去主观化的方法,分析由专家小组给出的进度风险因素间关联关系的评价信息,确定项目进度风险因素间的关联关系;根据关联关系建立风险关联网络,并阐述将风险关联网络分割为独立风险链的方法;将项目进度计划、风险链属性等信息纳入到蒙特卡洛仿真过程进行模拟,并提出以仿真输出结果为计算依据的风险链评估公式.在算例中,阐述并分析该方法的可行性和有效性. The concept of risk chain is put forward,and a novel approach was proposed for assessing schedule risks.First,in order to find out the interrelationships among risks,the evaluation information provided by apanel of experts was analyzed by an objectifying process; secondly, a riskinteraction network was established based on the identified interrelationships,and the method to divide a risk-interaction network into some unattached risk chains was explained;thirdly,a formula was provided to assess the various risk chains,according to obtained parameters from a simulation process taking the information of project schedule and properties of risk chains into consideration. Finally, a numerical example was analyzed to illustrate the feasibility and effectiveness of the proposed approach.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2015年第3期468-474,共7页 Journal of Tongji University:Natural Science
基金 国家自然科学基金(70972072) 上海市重点学科建设项目(B310)
关键词 建设项目 风险链 风险关联 进度风险 风险评估 construction projects risk chain risk interrelationships schedule risks risk assessment
  • 相关文献

参考文献24

  • 1Zou P X W, Zhang G, Wang J. Understanding the key risks in construction projects in China [J]. International Journal of Project Management, 2007, 25(6) : 601.
  • 2Lam K C, Wang D, Lee P T K, et al. Modelling risk allocation decision in construction contracts[J]. International Journal of Project Management, 2007, 25(5): 485.
  • 3Schatteman D, Herroelen W, Van de Vonder S, et al. Methodology for integrated risk management and proactive scheduling of construction projects[J]. Journal of Construction Engineering and Management, 2008, 134(11) : 885.
  • 40kmen C), 6zta A. Construction proiect network evaluation with correlated schedule risk analysis model [J]. Journal of Construction Engineering and Management, 2008, 134 ( 1 ) .. 49.
  • 5Baccarini D, Archer R. The risk ranking of projects: A methodology[J]. International Journal of Project Management, 2001, 19(3): 139.
  • 6Lyons T, Skitmore M. Project risk management in the Queensland engineering construction industry: A survey[J]. International Journal of Project Management, 2004, 22 ( 1 ) : 51.
  • 7Pmbok A. Guide to the project management body of knowledge [M]. Newtown Square: Project Management Institute, 2000.
  • 8Zayed T, Amer M, Pan J. Assessing risk and uncertainty inherent in Chinese highway projects using AHP [ J] . International Journal of Project Management, 2008, 26 (4) : 408.
  • 9Wang Y M, Liu J, Elhag T. An integrated AHP - DEA methodology for bridge risk assessment [J]. Computers & Industrial Engineering, 2008, 54(3): 513.
  • 10Bahli B, Rivard S. Validating measures of information technology outsourcing risk factors[J]. Omega, 2005, 33 (2) .. 175.

二级参考文献48

  • 1范海军,肖盛燮,郝艳广,周丹,贺丽丽.自然灾害链式效应结构关系及其复杂性规律研究[J].岩石力学与工程学报,2006,25(z1):2603-2611. 被引量:43
  • 2史培军.再论灾害研究的理论与实践[J].自然灾害学报,1996,5(4):6-17. 被引量:567
  • 3Wang H B, Sassa K, Xu W Y. Analysis of a spatial distribution of landslides triggered by the 2004 Chuetsu earthquakes of Niigata Prefecture, Japan [J]. Natural Hazards, 2007, 41 : 43 - 60.
  • 4Cheng J D, Huang Y C, Wu H L, et al. Hydrometeorological and land use attributes of debris flows and debris floods during typhoon Toraji, July 29 - 30, 2001 in central Taiwan [J]. Journal of Hydrology, 2005, 306: 161-173.
  • 5DaiFC, Deng J H, Tham L G, et al. A large landslide in Zigui County, Three Gorges area [J].Canadian Geotechnical Journal, 2004, 41(6): 1233- 1240.
  • 6Iverson R M. Landslide triggering by rain infiltration [J]. Water Resources Research, 2000, 36:1897 - 1910.
  • 7Salzano E, Iervolino I, Fabbrocino G. Seismic risk of atmospheric storage tanks in the framework of quantitative risk analysis [J]. Journal of Loss Prevention in the Process Industries, 2003, 16:403 - 409.
  • 8耿雪霏,刘凯,王德占.供应链风险的模糊综合评价[J].物流技术,2007,26(8):164-167. 被引量:17
  • 9Raz T, Shenhar A J, Dvir D. Risk management, project success, and technological uncertainty[J]. R&:D Man-agement, 2002, 32(2): 101 -109.
  • 10Li C B, Fan L H, Guo Y, et al. The Analytic Model and its application of Generalized Project Risk Analysis[C]// Proceedings of 2004 International Conference on Construction & Real Estate Management, 2004: 229-231.

共引文献180

同被引文献230

引证文献29

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部