期刊文献+

基于有限样本点的海上宏大工程环境影响估算方法

Environmental Impact Assessment of Great Ocean Projects Based on Finite Sample Points
下载PDF
导出
摘要 海上宏大工程建设前需评估其环境影响,但进行环境调查经济投入较高,鉴于在工程研究论证阶段初步估计环境影响即可满足决策需求,本研究选取部分环境影响指标,通过调查统计沿海已有工程的环境影响数据,用有限样本点的分析计算,比较经济地初步估计海上宏大工程生态环境影响,为宏观决策提供参考。本研究还结合渤海海峡跨海通道工程实例,分析计算了不同环境影响指标的数值范围。 Environmental impact assessment should be made for great ocean projects before construction. Since environment survey cost was high, and the preliminary environmental impact assessment could be used to make decision in the stage of engineering research and argumentation, only part of environmental impact indices were selected in the research. Based on environmental impact data of the existing coastal projects, the impact of great ocean projects on ecological environment was economically estimated by analyzing and computing finite sample points, which could provide evidence for macro-decision making. The channel across Bohai Straits was also taken as an example to analyze and calculate the numerical ranges for different environmental impact indices.
机构地区 大连理工大学
出处 《港工技术》 2015年第1期47-49,共3页 Port Engineering Technology
基金 国家自然科学基金(51279026) 辽宁省交通科研项目(201121)
关键词 有限样本 环境影响估算 海上宏大工程 渤海海峡跨海通道 finite sample environmental impact assessment great ocean projects channel across Bohai Straits
  • 相关文献

参考文献5

  • 1吕蓉,林建国,徐洪磊.港口规划环境影响评价指标体系的研究[J].海洋环境科学,2006,25(2):92-95. 被引量:15
  • 2D De Martini. Evaluating the Risk in Sample Size Determination[J] .Communicationsin Statistics-Simulationand Computation,2008,37(9):33-41.
  • 3刘锋.市场调查中样本容量的确定[J].商业研究,2003(16):143-144. 被引量:4
  • 4魏立力,马江洪,颜荣芳.概率统计引论[M].北京:科学出版社,2012.
  • 5Ali Waqar Azim, Syed Safwan Khalid, ShafayatAbrar. Modulation Classification based on ModifiedKolmogorov- Smimov Test[J]. Emerging Technologies(ICET),2013,(9):l-6.

二级参考文献6

  • 1[美]小卡尔·迈克丹尼尔 罗杰·盖兹/范秀成译.当代市场调研[M].北京:机械工业出版社,2002..
  • 2ALFREDO O R.A new method to determinethe level of the environmental impact assessment studies in Mexico[J].Environmental ImpactAssessment Review,2001,21:73-81.
  • 3FRIHY O E.The necessity of environmental impact assessment (EIA) in implementingcoastal projects:lessons learned from the Egyptian Mediterranean Coast[J].Ocean&Coastal Management,2001,44:489516.
  • 4SMITH H D,LALWANI C S.The North Sea:Co-ordinated sea use management[J].Geographyjournal,1996,39(2):109-115.
  • 5王金南,余德辉.发展循环经济是21世纪环境保护的战略选择[J].经济研究参考,2002(6):13-17. 被引量:35
  • 6肖华山.规划环境影响评价指标体系及评价方法探讨[J].金属矿山,2003,32(12):46-49. 被引量:38

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部