摘要
本文结合曹妃甸矿石码头三期地基处理的实例,通过试验区的试验和试验过程中的监测及施工完成后的检测结果综合分析,得出可以指导大面积施工的施工参数,使地基处理达到最佳效果,也可为类似工程的地基处理设计和施工提供参考。
Based on foundation treatment detail of Caofeidian ore terminal phase-3 project, the construction parameters were obtained by the experiments in trial area, the experimental process monitoring and the testing results analysis after completion of the project, which could be used to guide large area construction and optimize the foundation treatment. The research results will provide reference for the design and construction of similar projects.
出处
《港工技术》
2015年第1期88-91,共4页
Port Engineering Technology
关键词
塑料排水板
强夯
软土
地基加固
plastic drain board
dynamic compaction
soft soil
foundation reinforcement