摘要
文章介绍了直立炉耐火材料施工技术的核心部分炭化室砌筑。采取有针对性的工序安排,使用便于安拆的悬挂式操作平台,严格执行砌筑技术操作规程,从而加快了施工节奏,降低了工程造价,保证了工程质量。
In the paper,the building of coking chamber,the hard core for construction technology of refractory for body of vertical retort is introduced. The niche targeting order of sequences as well as the suspension type of operating platform convenient to install and dismantle are adopted so that the construction speed is quickened,construction costs are reduced and construction quality is guaranteed with strict instruction of technical operation for building.