摘要
随着物联网、云计算、移动互联网等技术的快速发展,企业产生的数据也飞速增长,大数据时代网络环境下每18个月产生的数据量等于有史以来数据量之和。文章以OCS系统的搬迁为例,讲述IT系统搬迁的基本流程和方式,在保障信息系统整体完好、连续运行条件下,在有限时间内将正在生产运行的OCS从原机房拆除、移动、安装到新机房的过程。
With the rapid development of technologies such as the Internet of things, cloud computing and mobile Internet, data produced by the enterprise is also growing rapidly. The amount of data generated every 18 months in the age of big data under the network environment is equal to the amount of data since the beginning of history. Taking the OCS system relocation as an example, this paper introduces the basic process about IT system relocation-within continuous operation and limited time, removing, transferring and installing the OCS to the new machine room.
出处
《湖南邮电职业技术学院学报》
2015年第1期32-36,共5页
Journal of Hunan Post and Telecommunication College