摘要
针对天铁铁水鱼雷罐脱线事故,通过选择合适的救援起复设备,搭建液压起复器基础整体平台,铺设临时铁道线路将鱼雷罐导出,重新修复损毁线路;制作铁码等措施,成功完成了救援。对事故处理过程中存在的问题进行了分析和探讨,完善了鱼雷罐救援方案,为处理类似的事故提供了相应参考依据。
In the off-track accident of molten iron torpedo ladle, the rescue succeeded through measures of selecting appropriate re-railing equipment, setting up an integral platform for hydraulic re-railer foundation, laying a temporary railway to guide the torpedo out, repairing damaged railways and making iron weights. The author discusses the problems during accident handling process and improves the rescue plan, providing a reference for similar events handling.
出处
《天津冶金》
CAS
2015年第1期43-44,47,共3页
Tianjin Metallurgy
关键词
铁水鱼雷罐
事故
救援
分析
molten iron torpedo ladle
accident
rescue
analysis