期刊文献+

某铅锌矿全尾砂膏体充填材料试验研究 被引量:2

Experiment study on unclassified-tailings paste filling material of a Pb-Zn Mine
下载PDF
导出
摘要 为建立全尾砂膏体充填系统,需对膏体充填材料进行试验研究。试验研究包括分析全尾砂理化性质、进行絮凝沉降试验、坍落度试验、单轴抗压强度试验。试验结果表明,该铅锌矿全尾砂作为充填骨料是可行的;絮凝剂的合理添加量为20g/t时,沉降效果最佳。膏体充填料适宜泵送充填质量浓度为81%,根据充填地点和目的,采用不同灰砂比的全尾砂膏体充填料进行充填。 Experimental study on paste will be carried out for the establishment of unclassified-tailings paste filling system.It includes the analysis of physical and chemical properties of unclassified tailings,flocculation sedimentation experiment,slump and uniaxial strength of the filling material.The results show that the unclassified tailings as filling material are feasible.The reasonable flocculant's dosage is 20g/t.The unclassified-tailings paste filling material′s mass concentration is 81%.According to the location and purpose of filling,the paste use different cement-sand ratios to fill.
出处 《有色金属(矿山部分)》 2015年第2期54-57,共4页 NONFERROUS METALS(Mining Section)
关键词 全尾砂膏体充填 絮凝沉降 坍落度 unclassified-tailings paste filling flocculation sedimentation slump
  • 相关文献

参考文献4

二级参考文献19

  • 1陈广文,古德生,高泉.高浓度浆体的浓度判据及其层流输送特性[J].中国有色金属学报,1995,5(4):35-39. 被引量:13
  • 2周爱民.矿山废料胶结充填[M].北京:冶金工业出版社,2006.
  • 3RevellMB.膏体强度[c]//中国有色金属学会.第八届国际充填采矿会议论文集.北京,2004:219-225.
  • 4蔡嗣经.充填采矿技术与应用[M].北京:冶金工业出版社,2009.
  • 5王方汉,姚中亮,曹维勤.全尾砂膏体充填技术及工艺流程的实验研究[C]//中国有色金属学会.第八届国际充填采矿会议论文集.北京,2004:51-55.
  • 6Barnes H A, Nguyen Q D. Rotating vane rheometry: a review. J non Newton Fluid Mech, 2001, 98( 1 ) : 1.
  • 7Boger D. Rheology and minerals industry. Miner Process Extr Met- all Rev, 1999, 20(1): 21.
  • 8于润仓.采矿工程师手册.北京:冶金工业出版社,2009.
  • 9Hallbom D J, Norwood W J. Fuzzy rheology and smooth running paste systems//Proceedings of the Tenth International Seminar on Paste and Thickened Tailings. Perth, 2007 : 199.
  • 10Nehdi M, Rahman M A. Estimating rheological properties of ce- ment pastes using various rheological models for different test ge- ometry, gap and surface friction. Cem Concr Res, 2004, 34 ( 11 ) : 1993.

共引文献46

同被引文献23

  • 1GB/T 50123-1999 土工试验方法标准[S].1999.
  • 2Hassani F P, Onellet J, Hossein M. Strength development in underground high sulphate paste backfill operation[ J] .Cana- dian Institute of Mining Bulletin, 2001,94( 1 050) :57-62.
  • 3Belem T, Benzaazoua M. An overview on the use of paste backfill technology as a ground support method in cut-and-fill mines[C].Proceeding of the 5th International Symposium on Ground Support in Mining and Underground Construction, 2004:637-650.
  • 4Ouellet S, Bussiere B, Mbonimpa M, et al. Reactivity and mineralogical evolution of an underground mine sulphidic ce- mented paste backfill~J].Miner Engineering,2006,19(5): 407-419.
  • 5Cetiner E G, Unver B, Hindistan M A. Regulations related with mining wastes, European Community and Turkey[J]. Madeneilik, 2006,45(1) : 23-34.
  • 6Karapinar N. Mine waste management: Use of paste technology[J].Madencilik, 2009, 48(1): 31-42.
  • 7Coussy S, Benzaazoua M, Blanc D, et al. Assessment of arsenic immobilization in synthetically prepared cemented paste backfill specimens[J~. Journal of Environmental Management, 2012, 93(1): 10-21.
  • 8Benzaazoua M, Belem T, Bussire B. Chemical factors that influence the performance of mine sulphidic paste backfill[J].Cement and Concrete Research, 2002, 32(7) : 1 133-1 144.
  • 9Kesimal A, Yilmaz E, Ercikdi B. Evaluation of paste backfill mixtures consisting ofsulphide-rich mill tailings and varying cement contents~J~. Cement and Concrete Research,2004, 34(10): 1 817-1 822.
  • 10张京明,陈玉香.新型散装水泥罐[J].山东建材,1998(6):25-26. 被引量:1

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部