摘要 钢管混凝土支架具有承载能力高、施工方便、造价低廉等优点,逐渐被应用到巷道支护中。但在一些使用中出现了注浆孔开裂的问题,严重地影响了支护的总体稳定性。运用数值模拟对支架进行力学性能研究,发现注浆孔开裂问题主要是由于开孔位置的不合理所导致,并确定了最优注浆孔位。 Concrete- filled steel tubular stent has high bearing capacity,convenient construction,low cost,and other advantages,which gradually be applied to the roadway supporting. However,grouting hole cracked in some use,which influences the overall stability of the support. We use numerical simulation to study the mechanical properties of the support,find that grouting hole cracking is mainly due to the location of the unreasonable hole,and determine the optimal grouting hole.
出处 《煤矿安全》 CAS 北大核心 2015年第3期33-36,共4页 Safety in Coal Mines
基金 2013年辽宁省大学生创新训练计划甲类资助项目(201310148026)
关键词 钢管混凝土支架 注浆孔位 力学性能 巷道支护 concrete-filled steel tubular support grouting hole location mechanical property roadway support
  • 相关文献

参考文献5

二级参考文献21

  • 1赵志明,王喜华.某岩石边坡的有限元分析[J].四川建筑,2004,24(6):43-44. 被引量:2
  • 2何满潮,谢和平,彭苏萍,姜耀东.深部开采岩体力学研究[J].岩石力学与工程学报,2005,24(16):2803-2813. 被引量:2030
  • 3刘天泉.矿山岩体采动影响与控制工程学及其应用[J].煤炭学报,1995,20(1):1-5. 被引量:208
  • 4彭苏萍.建立与完善我国煤矿高产高效矿井的地质保障系统的几个问题[A].谢和平.可持续发展与煤炭工业报告文集[C].北京:煤炭工业出版社,1998.19-25.
  • 5谢和平,彭苏萍,何满潮.深部开采基础理论与工程实践[M].北京:科学出版社,2005.3~14.
  • 6韩德馨,杨起.中国煤田地质学(下册)[M].北京:煤炭工业出版社,1980.
  • 7王桂粱,龙荣生,徐凤银,等.矿井构造预测[M].北京:煤炭工业出版社,1993.
  • 8佐洛塔列夫,丁健民(译).地应力测量与研究[M].北京:地震出版社,1987.
  • 9Aitmatov IT,Vdovin K D,Kejogulov K Ch, et al. State of stress in rock and rock - burst proneness in seimicative folded areas[ M]. Procs. of 6th ISRM. Canada, 1987.
  • 10BouskaV, Pesek J, Sykorova I. Probable modes of occurrence of chemical elements in coal. Acta Montana, Ser. B. Fuel, Carbon, Mineral Processing, Praha, 2000,10(117) :53 -90.

共引文献139

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部