期刊文献+

铁路立体交叉隧道施工爆破震动响应研究 被引量:3

Study of construction blasting vibration response in railway interchange tunnel
下载PDF
导出
摘要 文章通过建立不同交叉角度、净距和围岩条件的试验工况,对交叉段新建隧道施工爆破地震波引起的既有隧道衬砌的峰值速度进行分析,探讨了不同因素作用下立体交叉隧道施工爆破的动力响应。研究结果表明:处于既有隧道迎爆侧拱底和墙脚之间区域影响最为显著;除净距是上下交叉隧道最显著的影响因素外,随着交叉角度的增加,拱底速度峰值呈增大趋势,并且增长率逐渐加快;岩体越坚硬完整,爆破振动波传播衰减越慢,爆破地震波在传到既有隧道之前,出现峰值回升。 Through the establishment of experimental conditions with different cross angle,clear distance and rock conditions,the peak velocity of the existing tunnel lining caused by the seismic waves during the construction blasting of the new tunnel in cross section is analyzed to explore the dynamic response of construction blasting of interchange tunnel under the influence of different factors.The results are as follows:the maximum effect occurs between the arch bottom and wall foot facing the blasting side;in addition to the clearance of cross tunnel being the most significant factor,the peak velocity of bottom arch increases synchronously with the increase of crossing angle under the same clearance and the rate of growth accelerates gradually;the blasting vibration wave propagation decays slower in complete and hard rock,the peak velocity rebounds before blasting seismic waves reach the existing tunnel.
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 北大核心 2015年第3期363-368,共6页 Journal of Hefei University of Technology:Natural Science
基金 国家自然科学基金资助项目(50808176) 高速铁路基础研究联合基金重点支持资助项目(U1134208)
关键词 立体交叉隧道 施工爆破 时程分析 动力响应 interchange tunnel construction blasting time-history analysis dynamic response
  • 相关文献

参考文献4

二级参考文献21

共引文献168

同被引文献33

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部