摘要
基于宁蒙河段的水沙和河道断面资料,分析了该河段主要水文站年内的冲淤过程、规律和近期变化情况。结果表明:1宁蒙河段河道在年内经历两次冲淤平衡,一次是冬季的冲淤平衡,一次是春、夏、秋季的冲淤平衡,后者水量较为丰沛且对河道冲淤起主要作用;2宁蒙河段淤积主要发生在内蒙古河段,石嘴山和头道拐水文站的断面冲淤变化不大,其余水文站断面均发生了明显淤积;3近期河道淤积的主要原因是径流量较少和大流量洪峰日数显著减少。
Based on the detailed data on runoff,sediment and cross-section,process,pattern and recent changes of scour and silting within the reach of Ningxia-Inner Mongolia had been analyzed. The result indicates that 1)Ningxia-Inner Mongolia reach has twice balances of erosion and deposition,one occurs in winter and another one is in spring-summer-autumn respectively. The latter one has more runoff,so it is vital effect on balance of reach;2)the deposition mainly occurs in the Inner Mongolia section. River sections almost kept balance in scour and siltation at Shizuishan and Toudaoguai hydrometric stations. The others have significant deposition;3)recent siltation of channel is mainly due to significantly reduction of volume of runoff and number of days of flood peaks.
出处
《人民黄河》
CAS
北大核心
2015年第4期46-49,54,共5页
Yellow River
基金
国家"973"计划项目(2011CB403305)
国家自然科学基金资助项目(41371037)
关键词
水沙过程
冲淤平衡
二次冲淤
宁蒙河段
黄河
process of runoff and sediment
balance of erosion and siltation
secondary erosion and siltation
Ningxia-Inner Mongolia reach
Yellow River