深埋条件下绿泥石片岩洞段的变形特征 被引量:3

Deformation Charateristics of Chlorite Schist Tunnel Section Under Deep Buried Condition
下载PDF
导出
摘要 锦屏二级水电站深埋长引水隧洞最大埋深达2525 m,绿泥石片岩洞段开挖期间出现大规模塌方、围岩初期支护后的围岩持续变形、临时支护结构损坏等情况,给引水隧洞整个施工过程带来了较大的影响。本文旨在总结深埋隧洞软岩的变形特征,为类似工程的提供借鉴。 The maximum depth of a deep buried long diversion tunnel in Jinping Second LevelHydropower Station is 2525m. During the period of excavating chlorite schist tunnel section appearsmassive landslides and continuous deformation of surrounding rock after initial support and structuraldamage after temporary support etc.. It brings a greater impact to the diversion tunnel throughout theconstruction period. This paper aims to summarize the deformation characteristics of soft rock in deeptunnel and provides a reference for the similar projects.
作者 周春宏
出处 《科技通报》 北大核心 2015年第3期108-111,共4页 Bulletin of Science and Technology
关键词 深埋条件 绿泥石片岩 变形 deep buried condition Chlorite schist deformation
  • 相关文献

参考文献5

  • 1周春宏等.雅砻江锦屏二级水电站可行性研究报告3.工程地质[R] .杭州:中国水电顾问集团华东勘测设计研究院,2005,10.
  • 2甘小泉等.雅砻江锦屏二级水电站1号引水系统工程专项安全鉴定设计单位自检报告-第三分册工程地质[R] .杭州:中国水电顾问集团华东勘测设计研究院,2012,8.
  • 3周辉、陈祥荣等.雅砻江锦屏二级水电站绿泥石片岩洞段围岩长期力学特性及衬砌长期安全性研究总报告[R].杭州:中国水电顾问集团华东勘测设计研究院及中国科学院武汉岩土力学研究所,2013,10.
  • 4侯靖等.深埋大直径软岩隧洞变形与稳定研究成果[R].杭州:中国水电顾问集团华东勘测设计研究院,2013,7.
  • 5张洋等.雅砻江锦屏二级水电站西端引水隧洞绿泥石片洞段变形处理设计专题报告[R].杭州:中国水电顾问集团华东勘测设计研究院,2009,6.

同被引文献43

引证文献3

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部