遂溪中间站改扩建施工过渡方案研究

Research on Construction Transitional Scheme of Suixi Intermediate Station Expansion Project
下载PDF
导出
摘要 遂溪站是湛江枢纽内的中间站,在新建合湛线工程中车站增建茂名方向疏解联络线,全站按"四进—四出"上下行两场进行改扩建。根据车站改扩建方案特点及车站既有特征,结合运输生产的需求,研究制定了基于信号过渡模式的站改施工过渡方案。文章详细分析了既有设备改建难点以及施工过渡的原则和方法,分析比较了信号采用不同过渡模式对过渡工期、施工组织、工程费用及运输组织产生的影响。通过研究得出结论,信号采用"新站房-新站型"的过渡模式较为合理,能有效节省过渡工程费用,降低运输干扰。最后,基于该信号过渡模式,统筹站前、站后各专业制定出合理的全站施工过渡方案和具体施工过渡步骤,确保车站改扩建工程能顺利有效的实施。 Suixi Station is an intermediate one located in Zhanjiang railway terminal. For the project of new Hepu-Zhan-jiang line, it is planned to build an additional untwining connecting line in Maoming direction in the station. The station will be expanded according to“four-entrance—four-departure” up yard and down yard. According to the characteristics of reconstruction scheme and existing features of the station and in combination with the demand of transportation produc-tion, the construction transitional scheme based on signal transition model is determined. The paper analyzes in detail the reconstruction difficulties of the existing equipment, principles and methods of the construction transition, and compares the influence of the signal with different transition models on the transition period, construction organization, project cost and transport organization. Study result shows that signal the transition model of"new station building-new station type"is more reasonable and can effectively save the transition engineering costs and reduce the interference of transportation. Finally, based on the signal transition mode, a reasonable detailed transition program and specific construction transi-tional step shall be developed to ensure the reconstruction and expansion of the station can be implemented successfully.
作者 杨健
出处 《高速铁路技术》 2015年第1期60-64,共5页 High Speed Railway Technology
关键词 遂溪站 施工过渡 信号过渡 Suixi station construction transition signal transition
  • 相关文献

参考文献6

  • 1GB50091-2006,铁路车站及枢纽设计规范[S].
  • 2中国铁路总公司.铁路技术管理规程(高速铁路部分)[s].
  • 3中铁二院工程集团有限责任公司.新建铁路合浦至湛江线初步设计第十一篇[z].成都:中铁二院工程集团有限责任公司,2014.
  • 4铁建设[2008]189号,铁路大型临时工程和过渡工程设计暂行规定[s].
  • 5铁道第四勘察设计院.铁路工程设计技术手册.站场及枢纽[M].北京:中国铁道出版社,2004.
  • 6TB10001-2005,铁路路基设计规范[S].

共引文献335

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部