2ASIEDU Y. Product life cycle cost analysis: state of the art review[J]. International Journal of Production Research, 1998, 36(4) : 883-908.
3GREENE L E, SHAW B L. The steps for successful life cycle cost analysis [C]// Proceedings of the IEEE 1990 National Aerospace and Electronics Conference, May 21-25, 1990,Dayton, OH, USA: 1209-1216.
4SOLOMON R, SANDBORN P A, PECHT M G. Electronic part life cycle concepts and obsolescence forecasting[J]. IEEE Trans on Components and Packaging Technologies, 2000, 23(4) : 707-717.
5MEYER C, de DONCKER R W. LCC analysis of different resonant circuits and solid-state circuit breakers for medium-voltage grids[J]. IEEE Trans on Power Delivery, 2006, 21(3) : 1414-1420.
6POLITANO D, FROHLICH K. Calculation of stress-dependent life cycle costs of a substation subsystem-demonstrated for controlled energization of unloaded power transformers [J]. IEEE Trans on Power Delivery, 2006, 21(4): 2032-2038.
7NILSSON J, BERTLING L. Maintenance management of wind power systems using condition monitoring systems-life cycle cost analysis for two case studies[J]. IEEE Trans on Energy Conversion, 2007, 22(1): 223-229.
8HINOW M, MEVISSEN M. Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm[J]. IEEE Trans on Power Delivery, 2011, 26 (1): 197-204.
9PIPATTANASOMPORN M, WILLINGHAN M, RAHMAN S. Implications of on-site distributed generation for commercial/ industrial facilities[J]. IEEE Trans on Power Systems, 2005, 20(1): 206-212.
10ZHU Hong, HU Wenping. An instance based 3-dimensional model of life cycle cost for overhead lines[C]// Proceedings of the International Conference on Computer, Mechatronics, Control and Electronic Engineering, August 24- 26, 2010, Changchun, China: 431-434.