期刊文献+

世行贷款广西农村供水与环境卫生项目水厂管理现状与对策 被引量:1

Current situation and strategy of management of water-plants in the Rural Water Supply and Sanitation Project in Guangxi
下载PDF
导出
摘要 总结了世行贷款广西农村供水与环境卫生项目水厂的管理现状,指出水厂的运行管理中存在缺乏有效管理、运行成本过高、人员更换频繁、还贷能力差等问题,分析了还贷能力差的几个原因,如包袱沉重、设计规模过于超前、项目实施地区经济基础差、有效的管理机制未建立等,提出了管理对策。 This article summarizes the current situation of managing the water-plants of the Rual WaterSupply and Sanitation Project in Guangxi credited by the World Bank. It points out the issues in thefunction management of the water-plants, such as lack of efficiency, high cost, frequent personnelchanges, poor ability of repaying loan, etc. The causes of the poor ability are analyzed: heavy burden,design scale overly leading, bad regional economic base, without effective management mechanism, etc.It also probes into the strategy of management.
出处 《卫生软科学》 2002年第4期45-46,共2页 Soft Science of Health
  • 相关文献

同被引文献2

  • 1卫生部统计信息中心.2007年我国卫生事业发展统计公报[0L].http://www.moh.gov.cn/publicfiles/business/htmlfiles/mohbgt/s6689/ 20081M/33525.htm,2008-11-7.
  • 2中国工程建设标准化协会.CECS82-1996农村给水设计规范[S].

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部