摘要
介绍了印度维柯拉姆水泥厂(VC)2×25 MW燃煤电站机组采用的高温高压循环流化床锅炉的特点,对调试运行中的吹管和带负荷运行进行了总结。
The features of high-temperature and high-pressure CFB boiler in Vikram Cement(VC) are introduced. The pipe blowing and on-load operation during commission is summarized.
出处
《电站系统工程》
2015年第2期79-80,共2页
Power System Engineering
关键词
高压
循环流化床
吹管
调试运行
high-pressure
CFB
pipe blowing
commissioning operation