摘要 为适应黄河水含沙量大,淤积与冲刷变化引起的泵站实际净扬程变化大的特点,对尊村引黄一级泵站的水泵、流道、流检门、技术供水进行改造。文中介绍了技术改造方案的拟订、参数确定并对技术改造后的效果进行了测试分析。 In order to adapt the Yellow River's flow characteristics including large sediment charge and large change of the actual net pumping head caused by silting and scouring, the technical transformation on pump, flow passage, flow inspection door and technical water supply was conducted for the Zuncun Yellow River Diversion First Stage Pumping Station. The paper introduces the process of drawing up the technical transformation scheme and determining the pump parameters and analyzes the testing results of the transformation effect after finishing the technical transformation of this pumping station.
作者 李辉
出处 《山西水利科技》 2015年第1期106-107,116,共3页 Shanxi Hydrotechnics
关键词 泵站 技术改造 测试 pumping station technical transformation test
  • 相关文献

参考文献2

  • 1中华人民共和国水利部.GB50286—98.堤防工程设计规范[s].北京:中国计划出版社,1998:6—7.
  • 2长江水利委员会长江勘测设计研究院.SL252—2000.水利水电工程等级划分及洪水标准[S].北京:中国水利水电出版社,2000:7-8.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部