期刊文献+

汉石桥湿地引水工程的可行性及对地下水的影响研究

Study on the Feasibility of Hanshiqiao Wetland Water Diversion Project and Its Effect on Groundwater
下载PDF
导出
摘要 以汉石桥湿地引水工程为例,结合北京市人民政府关于实行最严格水资源管理制度的意见,从水资源承载能力出发,收集和调查项目区的水资源状况和供水现状,分析项目需水合理性,供水方案的可行性和可靠性,本地区水资源条件对项目用水的保障程度等,以及项目用水对区域水资源和其他用户的影响情况。 In this paper, Hanshiqiao Drinking Water Project was introduced. According to the plan of water resource management system drafted by Beijing Municipal People's Government and the bearing capacity of water resources, we have investigated the water resources and water supply in this area. Furthermore, rationality of water requirement and reliability of water supply schemes in this project were analyzed. Finally, both security of local supplying water resources and influences to other water users have been studied.
出处 《城市地质》 2015年第1期34-38,共5页 Urban Geology
关键词 取用水合理性 取水可靠性 取水影响 地下水影响 Rationality of water requirement Reliability of water supply Infl uence of water supply Impact to ground water
  • 相关文献

参考文献4

  • 1北京市水利规划设计研究院.汉石桥湿地引水工程项目建议书(代可行性研究报告).2011年11月.
  • 2顺义新城温榆河水资源利用工程项目建议书(代可行性研究报告).2006年11月.
  • 3顺义新城温榆河水资源利用工程(二期)项目建议书(代可行性研究报告).2011年.
  • 4北京市水利科学研究所.顺义新城温榆河水资源利用工程受水区地下水水位水质动态变化规律研究.2012年3月.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部