本工程施工围堰尺寸犬,开挖深度大,导致施工难度增加,鉴于以往钢板桩围堰施工中经常出现各种技术难点,影响钢板桩围堰施工质量,存在安全和质量隐患。因此通过涡河三桥深水钢板桩围堰施工过程分析,以便达到对钢板桩围堰施工质量的控制。
The large size of the cofferdam construction, excavation depth, resulting in increased difficulty of construction.In view of the previous steel sheet pile cofferdam construction often appear in a variety of technical difficulties, affecting the quality of the steel sheet pile cofferdam construction, security and quality problems. Therefore, by Guo River Bridge deepwater steel sheet pile cofferdam :onstruction process analysis in order to achieve the construction quality control of steel sheet pile cofferdam.