摘要 文中以渤海某上岸管道项目为例,对海对海的定向钻穿越技术进行了研究。文中介绍了穿越工程的概况,论述了穿越设计原则,研究穿越设计方案和施工方案,包括钻机选型、施工平台布置以及海上施工流程等。研究结果表明:海对海定向钻穿越技术合理可行,相对于常规的开挖铺管方式而言,不仅可以加大海管埋深,最大限度地保护管道,节省施工工期和费用,还减小了对环境和航道交通的影响。研究成果为穿越航道或其他障碍物的海管设计与施工提供了参考。 In this paper, the technique of sea-to-sea directional drilling was studied for an export pipeline in Bohai Sea. The paper introduced the general situation of crossing project, discussed the crossing design principles, then proposed design programs and construction programs, including rig selection, layout of construction platforms and offshore construction process. The research results showed that the sea-to-sea directional drilling technique is reasonable and practicable. Compared with conventional trenc- hing and laying method, the new technology can not only keep deeper bury depth, maximize the protection of subsea pipelines, and save construction time and costs, but also reduce the impact on environments and channel traffics. The research results provid a guiding role for design and construction of subsea pipelines which cross channel and other obstructions.
出处 《管道技术与设备》 CAS 2015年第2期43-46,59,共5页 Pipeline Technique and Equipment
关键词 海对海 定向钻穿越 技术研究 sea-to-sea directional drilling technique study
  • 相关文献

参考文献3

二级参考文献2

  • 1中华人民共和国国家质量技术监督局.GB 17502-1998海底电缆管道路由勘察规范[S].北京:中国标准出版社,1998.
  • 2刘阿成.岱山县引水应急工程海底管道路由勘测报告[R].上海:上海东海海洋工程勘察设计研究院,2007.

共引文献2

同被引文献35

  • 1陈礼吉,吕为照.非开挖技术优势及应用[J].建设科技,2004(14):40-41. 被引量:7
  • 2杜华东.定向钻穿越在海底管道工程中的应用[J].管道技术与设备,2007(1):36-37. 被引量:7
  • 3SY/T6968-2013,油气输送管道工程水平定向钻穿越设计规范[S].
  • 4GB50424-2015,油气管道穿越工程施工规范[S].
  • 5Peter hennig.Trenchless Installation Methods of Sea Outfalls. International Symposium on Outfall Systems.mardel plata, Argentina,2011.
  • 6Eric R. Skonberg P E and Tim C.McGuire. A Bridge Under Troubled Waters:We Have Found the Way[J]. Pipeline Engineering and Construction, 2004.
  • 7Neil Smith, BSc CEng.Directionally Drilled Crossing of Dauphin Island[C].Mobile Bay, Alabama. "No-Dig 92" in Paris, France, 1992.
  • 8Hugh W O' Donnell, Eric R. Kick in the Tail Saves HDD Shore Approaches[J].New Pipeline Technologies,Security and Safety, 2003.
  • 9API-RP-2A. Planning, Designing, and Constructing Fixed Offshore Platforms-Working Stress Design 21st Editiom Erra- ta and Supplement 3[S-]. 2007.
  • 10AISC-89. Specification for Structural Steel Buildings-Allowable Stress Design and Plastic Design[S-]. 1989,.

引证文献8

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部