摘要
介绍了某新建长输管道沿线的地质情况和输油工艺,保温输油管道防腐层和保温层选用规范和两种埋地管道阴极保护方法。根据保温输油管道防腐保温层选用规程,确定了此管道的防腐层和保温层选用方案,比较两种阴极保护方法,确定管道沿线阴极保护站的方案。
Geological conditions and oil transportation process of a new long distance pipeline were introduced as well as the selection standard of anticorrosion layer of heat preservation pipeline, two cathodic protection methods of the buried pipeline were compared. At last, the anticonrrosive coating and insulating layer of pipeline were determined as well as the pipeline cathodic protection method.