摘要 文章阐述并分析了风电并网后对电力系统备用容量的确定、获取和费用分摊的影响,以及风电并网后系统备用相关问题研究的必要性,提出了对上述各方面进一步研究的思路和方法,为实现风电并网系统安全经济运行提供一些参考。 In this article the influences of wind power integration on the system reserve capacity and the reserve capacity procurement and cost allocation are mainly expounded and analyzed, the necessity of issues related to reserve capacity caused by wind power connected to the grid is confirmed, and the thinking and method for further research on such issues are put forward to provide some references for safe and economic operation of the grid with wind farms.
出处 《可再生能源》 CAS 北大核心 2015年第4期565-571,共7页 Renewable Energy Resources
基金 基于超额风电自行消纳的有偿调峰服务市场交易理论研究(51107007)
关键词 风电并网 备用容量确定 备用获取 备用费用分摊 wind power integration rreserve capacity determination reserve capacity procurement reserve capacity cost allocation
  • 相关文献

参考文献33

  • 1Doherty R, O'Malley M. A new approach to quantify reserve demand in systems with significant installed wind capacity [J].IEEE Transactions on Power Systems, 2005,20(2) :587-595.
  • 2Strbac G, Shakoor A, Black M, et al. Impact of wind generation on the operation and development of the UK electricity system [J]. Electric Electricity power systems Research, 2007,77: 1214-1227.
  • 3Luickx PJ,Delarue ED, D'haeseleer WD. Considera- tions on the backup of wind power: operational backup [J]. Applied Energy,2008,85 : 787-99.
  • 4M H Albadi, E F E1-Saadany. Overview of wind power intermittency impacts on power systems [J]. Electric power systems research, 2009,2986 : 1-6.
  • 5Ackermann,T John and Sons ltd. Wind power in power system [M]. Harper Collins :John Wiley&Sons,2005 : 143-167.
  • 6Ken Dragoon. Valuing Wind Power Generation on Inte- grated Power System[M]. London : Elsevier Inc, 2010.63- 85.
  • 7颜巧燕,温步瀛,江岳文.风电并网后系统备用容量需求分析[J].福建电力与电工,2009,29(2):14-16. 被引量:15
  • 8Bernhard Ernst. Analysis of wind power ancillary services characteristics with German 250MW wind data [R].USA Oak Ridge: Department of Energy Lboratory, 1999.
  • 9J Charles Smith, Edgar A DeMeo,Brian Parsons. Wind power impacts on electric power system operating costs : summary and perspective on work to date[A]. American Wind Energy Association Global Wind Power Confer- ence [C]. Chicago,Illinois :American Wind Energy As- sociation Global Wind Power Conference,2004. 2-10.
  • 10Zhao Yunli, Zhu Quansheng, Wang Juanjuan, et al. Interruptible load included reserve procurement method with wind power integration [J]. International Review of Electrical Engineering, 2012,7 (3) : 4631-4638.

二级参考文献216

共引文献661

同被引文献163

引证文献10

二级引证文献120

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部