摘要
文章阐述并分析了风电并网后对电力系统备用容量的确定、获取和费用分摊的影响,以及风电并网后系统备用相关问题研究的必要性,提出了对上述各方面进一步研究的思路和方法,为实现风电并网系统安全经济运行提供一些参考。
In this article the influences of wind power integration on the system reserve capacity and the reserve capacity procurement and cost allocation are mainly expounded and analyzed, the necessity of issues related to reserve capacity caused by wind power connected to the grid is confirmed, and the thinking and method for further research on such issues are put forward to provide some references for safe and economic operation of the grid with wind farms.
出处
《可再生能源》
CAS
北大核心
2015年第4期565-571,共7页
Renewable Energy Resources
基金
基于超额风电自行消纳的有偿调峰服务市场交易理论研究(51107007)
关键词
风电并网
备用容量确定
备用获取
备用费用分摊
wind power integration
rreserve capacity determination
reserve capacity procurement
reserve capacity cost allocation