摘要 本文叙述了核电站双层安全壳施工技术的创新。诸如双壳施工顺序、模板选用、钢筋绑扎、预埋件安装、混凝土配置、预应力张拉、钢衬里安装、数字化和管理信息系统等方面的创新。并根据双壳施工特点,提出了需要继续改进的技术问题。 This paper describes the innovation of construction techniques of nuclear power plant double wall containment. Such as double hull construction sequence, template selection, reinforcing bar banding, embedded parts of installation, concrete configuration, prestressed tensioning, steel lining board installation, digitization and innovation of management information systems, etc. And according to the characteristics of the double shell construction, the need to continue improving the technical problems is put forward.
出处 《核科学与工程》 CSCD 北大核心 2015年第1期103-111,共9页 Nuclear Science and Engineering
关键词 核电站 双层安全壳 技术创新:研讨问题 nuclear power plants double containment technological innovation problem study
  • 相关文献

参考文献6

  • 1刘镐.大型压水堆核电站双层安全壳施工技术探讨.233网校论文中心.2010.
  • 2王辉诚,陈立胜,吕光晔.核电站高性能大体积混凝土配制与施工技术[J].核动力工程,2011,32(S2):47-50. 被引量:6
  • 3史春元,王建国,金成,等.预制应力法控制核电站钢衬里简体壁板焊接变形的研究[J].2012第八届中国北方焊接学术会议论文集.2013.
  • 4慧聪工程机械网TlT.福清核电采用了欧维姆锚固体系和张拉设备[J].2013.08.
  • 5廖春生.台山核电站1号核岛安全壳预应力施工完成[s].中核华兴.2014.01.
  • 6王开华.范群喜,祖斌,等.我国核电站综合建造技术与工程管理研究成果[s].中国核工业建设集团公司.2005.12.

共引文献5

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部