北京绿地中心工程施工新技术综述 被引量:8

OVERVIEW ON NEW CONSTRUCTION TECHNIQUES OF BEIJING GREEN CENTER PROJECT
下载PDF
导出
摘要 北京绿地中心4号商务办公楼工程建筑高260 m,是超高层工程。结构形式为型钢外框内筒结构体系,装修功能多样、外檐独特,该工程施工工艺复杂、垂直运输超高降效问题突出。根据超高层的施工特点及难点,工程采用了高性能高流态混凝土、桁架转换层超重构件吊装、钢板—混凝土组合剪力墙裂缝控制、异型幕墙板块吊装、消防安全控制、BIM技术、远程质量验收系统等创新技术,取得了多项科研成果,其中钢板—混凝土组合剪力墙裂缝控制关键技术成果填补了国内空白,达到了国际先进水平。 Beijing Greenland Center No.4 business office building project of building height of 260 meters, is a high-rise project. Structure for the type steel frame tube structural system, functional diversity, eaves unique decoration, construction process of the engineering complex, vertical transportation of ultra high efficiency reduction problem is serious. Therefore, according to the construction features and difficulties of super high-rise buildings, the project adopted the high performance and high flowing concrete truss transfer layer, overweight member hoisting, steel - control, crack of concrete composite shear wall shaped curtain wall plate lifting, fire safety control, BIM technology, remote quality approval system and a series of technological innovation, has made a number of achievements in scientific research the crack, steel - concrete composite shear wall control results of the key technology to fill the domestic blank, reached the international advanced level.
出处 《建筑技术》 北大核心 2015年第4期294-299,共6页 Architecture Technology
关键词 超高层建筑 混凝土 超重吊装 裂缝控制 远程验收 super high-rise building concrete overweight hoisting crack control remote approval
  • 相关文献

同被引文献33

引证文献8

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部