超高层塔式起重机设计及吊装能力分配研究与应用 被引量:6

DESIGN OF SUPER HIGH-RISE CRANE AND HOISTING THE ABILITY TO DISTRIBUTE RESEARCH AND APPLICATION
下载PDF
导出
摘要 超高层建筑施工工艺复杂,大型超重构件多,施工中材料垂直运输量大。北京绿地中心工程施工中,对超高层塔式起重机及吊装能力进行深入研究,通过多方面的方案优化,按塔式起重机吊装能力进行合理分配,有效提升了塔式起重机的使用效率,顺利实现了工程进度目标。 Construction of super-high building involves complex process, many overweight large components and huge workload of vertical material transportation, During construction of Beijing Greenland Center project, super-high tower crane and its lifting capacity; were researched in depth. After scheme optimization on different aspects, tower cranes were reasonably distributed according to their lifting capacities, so as to effectively improve their utilization efffeieney and to successfully guarantee construction schedule.
出处 《建筑技术》 北大核心 2015年第4期358-361,共4页 Architecture Technology
关键词 超高层 方案优化 吊装 垂直运输 super-high building scheme optimization lifting vertical transportation
  • 相关文献

参考文献1

二级参考文献4

  • 1GB50010-2002.混凝土结构设计规范[S].[S].,..
  • 2GB50009-2001.建筑结构荷载规范[S].[S].,..
  • 3GB/T13752-1992.塔式起重机设计规范[S].[S].,..
  • 4甘丹.杭州湾大桥海上观光塔在施工过程中塔式起重机与观光塔的相互作用研究[D].兰州:兰州大学,2008.

共引文献4

同被引文献30

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部