摘要 对小铁山矿上向巷道式胶结充填采矿法在充填体下底柱回采工艺进行系统的分析和研究。运用充填体的弹性力学理论,结合现场生产的现状,在安全的条件下,合理进行上向巷道式第一分层充填体的设计,解决困扰矿山充填体下底柱回采问题。 the paper has conducted analysis and study on sill pillared stopping technology under the filling mass adopting the upwards laneway cemented stopping-filling mining. By applying elastic mechanics theory of the filling mass, with the present production situation on site, the upwards laneway on the first layer of filling body resonably under the condition of safe was designed. The design has resolved the problems that puzzled the mine. in sill pillared stopping under the filling mass.
机构地区 西北矿冶研究院
出处 《甘肃冶金》 2015年第2期1-3,7,共4页 Gansu Metallurgy
关键词 胶结充填 底柱充填体 工艺研究 cemented filling filling mass over sill-pillared technical study
  • 相关文献

参考文献4

  • 1刘可任.充填理论基础[M].北京:冶金工业出版社[M].1988.10.
  • 2刘北辰,陆鸿森.弹性力学[M].北京:冶金工业出版社[M].1989.4.
  • 3北京矿冶研究总院,白银公司小铁山铅锌矿.机械化难采矿体上向巷道式尾砂胶结充填法试验研究报告[R].1993.10.
  • 4北京矿冶研究总院.小铁山铅锌矿巷道式充填法试验回采设计[R].,1987..