基于有限元分析的超高层建筑沉降后浇带封闭时间确定

Super high-rise building the finite element analysis of post pouring settlement belt sealing time is determined based on the
下载PDF
导出
摘要 采用ANSYS软件,分析沉降后浇带封闭前主楼和裙房的相应沉降差以及封闭沉降后浇带后沉降后浇带是否会开裂,以判断能否在施工阶段封闭沉降后浇带。研究结果表明:对于采用CFG桩地基的高层建筑不需要设置沉降后浇带。 by using the ANSYS software, the analysis of post pouring settlement belt before the closure of the main building and the podium of the corresponding differential settlement and settlement after closure of post pouring settlement belt of post pouring belt will crack, to determine whether in the construction phase enclosed subsidence of post pouring belt.The results of the study show that:for the use of CFG pile foundation of high-rise buildings do not need to set the post pouring settlement belt.
出处 《中国建材科技》 2015年第2期236-236,240,共2页 China Building Materials Science & Technology
关键词 ANSYS 超高层 沉降后浇带 封闭时间确定 ANSYS high-rise post pouring settlement belt closed time determination
  • 相关文献

参考文献3

二级参考文献6

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部