摘要
旧堤大部分采用人工填土,填土密实度差、抗渗性能差。采用方案比较的方法,最终选择灌浆填充作为旧堤防渗处理的方案,从而堤升抗渗能力,达到旧堤防渗加固处理的目的。
Most of the old artificial embankment fill, fill compactness poor, poor impermeability. Comparative method using the program, the final choice of grout filled as old dike seepage treatment program, and thus impervious dike liter capacity, to achieve the purpose of the old dike seepage reinforcement.